WarTable for Construction

Win more bids and protect every dollar from estimate to final draw.

Jobs get won in the office and lost in the field — through slow bids, unbilled change orders, and cash that arrives late. WarTable ties your estimating, jobsite, and back office together so margin survives the project.

For general contractors, builders & specialty trades

Bids out faster, with a win rate you can track
Change orders captured — and billed
Job costing and cash flow in real time

Sound familiar?

Where construction margin disappears

The bid looked profitable. Then the field, the paperwork, and slow payment chipped away at it. Here's where it usually goes.

Bids take too long

Estimating is slow and manual, so you bid fewer jobs, miss deadlines, and lose work you should have won.

Change orders leak profit

Field changes happen verbally and get done before they're documented — so the work gets built but never billed.

Office and field are disconnected

Plans, schedules, and updates live in different places. The crew works off old info and rework follows.

Cash flow is always tight

Progress billing lags, AR slips, and you're floating payroll and materials while waiting to get paid.

Project Control Score

How tight is your bid-to-cash operation?

Six questions across bidding, jobsite control, and cash. Get an instant 0–100 score and the gap costing you the most margin.

Bids & BacklogJobsite ControlCash & Costing

What you'll get

  • An instant 0–100 score for your operation
  • A breakdown across each area we measure
  • Your biggest gap, plus where to focus next

About 3 minutes · 6 questions · No score without your results

Put Athena to work for your construction business.

See the exact workflows WarTable can run for a business like yours — live, in a 30-minute demo.